Caution!
When turning the union nuts (b) using an open-ended spanner, hold the water
volume regulators (c) in the set position.
9.5
Establish the water connection.
9.6
Provide the water drain.
9.7
Align the water volume regulators (d) so that the operating element (e) is freely
accessible. Loosen the flush connector for this purpose, if required.
Install the electrical T-distributor
☞
Important!
The components of the electrical T-distributor may only be installed after the power
has been switched off.
☞
When using cables other than the system line, pay attention to the different colour
code. The outer diameter must not exceed 7.5 mm.
9.8
Remove the sleeving (f) of the system lines (approx. 40 mm).
9.9
Push the cap nut (h) onto the system line (g) up to the limit stop.
☞
The various wire guides are marked with numbers 1 to 4.
A: Union nut
B: FAR-Best.-Nr. 2000104272
FAR-Best.-Nr. 2000104274
FAR-Best.-Nr. 2000100801
FAR-Best.-Nr. 2000100852
A
1
brown
2
white
3
blue
4
black
9.10 Push the wires (k) into the wire guides (l) according to their colours.
9.11 Cut off the projecting wire ends flush, i.e. without protrusions.
9.12 Push the union nut (h) onto the electrical T-distributor (m) and tighten it to the
required torque (1.2 Nm).
B
red
white
blue
black
- 6 -