Step 9
a. Take out the U burner (F) with igniting needle pre-assembled already, make sure the igniting needle is pointed
right to the small gas hole of the U burner (F).
b. Put the U burner (F) through the hole of the fire bowl, connect it with the Main Valve (S). Make sure the valve
nozzle is inserted to the U burner.
c. Align the hole of U burner (F) with the burner support (Q), insert 2pcs M6x12 bolts (AA) into the pre-drilled holes
separately and screw them tightly.
d. Insert the ignition wire to the main valve. (As the below fig showed in magnified)
Step 10
a.
Align the hole on the Up Right Hinge (M) with the hole on the Lid (A).
b.
Screw 2pcs M4x12 bolt (BB) to the pre-drilled hole along with one washer (EE) and lock each by M4 nut (DD).
Tighten by screwdriver.
c.
Do it again with the Up Left Hinge (N).
34