Maintenance; Important Information Regarding The Refrigerant Used; Maintenance Activities; Standstill - Daikin ROTEX RKHBH008BA Manuel D'utilisation

Unité intérieure pour système de pompe à chaleur air à eau et options
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 52
M
AINTENANCE

Important information regarding the refrigerant used

This product contains fluorinated greenhouse gases covered by the
Kyoto Protocol.
Refrigerant type:
R410A
(1)
GWP
value:
1975
(1)
GWP = global warming potential
Periodical inspections for refrigerant leaks may be required
depending on European or local legislation. Please contact your local
dealer for more information.

Maintenance activities

DANGER
Do not touch water pipes during and immediately after
operation as the pipes may be hot. Your hand may
suffer burns. To avoid injury, give the piping time to
return to normal temperature or be sure to wear
proper gloves.
Do not touch any switch with wet fingers. Touching a
switch with wet fingers can cause electrical shock.
WARNING
Do not touch the refrigerant pipes during and immediately
after operation as the refrigerant pipes may be hot or cold,
depending on the condition of the refrigerant flowing
through the refrigerant piping, compressor, and other
refrigerant cycle parts. Your hands may suffer burns or
frostbite if you touch the refrigerant pipes. To avoid injury,
give the pipes time to return to normal temperature or, if
you must touch them, be sure to wear proper gloves.
In order to ensure optimal availability of the unit, a number of checks
and inspections on the unit and the field wiring have to be carried out
at regular intervals, preferably yearly. This maintenance should be
carried out by your local Rotex technician (see installation manual).
The only maintenance which may be required by the operator is:
keeping the remote controller clean by means of a soft damp
cloth,
checking if the water pressure indicated on the manometer is
above 1 bar.
Only for the optional domestic hot water tank:
A check for correct operation of the pressure relief valve
installed on your domestic hot water tank, has to be carried out
at least every 6 months: it is important that the lever on the valve
is actuated to prevent accumulation of mineral deposits that may
impair valve operation and to confirm that the valve and
discharge pipe are not blocked. The lever should be operated
slowly and smoothly to avoid a sudden rush of hot water from
the discharge pipe.
Failure to operate the relief valve actuating lever may result in
the water heater exploding.
Continuous leakage of water from the discharge pipe may
indicate a problem with the water heater.
If a discharge pipe is connected to the pressure relief device it
must be installed in a continuously downward direction and in a
frost-free environment. It must be left open to the atmosphere.
CAUTION
If the supply cord is damaged, it must be replaced by the
manufacturer, its agent or similar qualified persons in order
to avoid hazards.
Operation manual
15

Standstill

NOTE
During longer periods of standstill, e.g. during summer
with a heating only application, it is very important
NOT TO SWITCH OFF THE POWER SUPPLY towards
the unit.
Switching off the power supply stops the automatic
repetitive movement of the pump in order to prevent it
from getting jammed.
T
ROUBLESHOOTING
The guidelines below might help to solve your problem. If you cannot
solve the problem, consult your installer.
P
OSSIBLE CAUSES
No readings on the remote controller
(blank display)
One of the error codes appears
The schedule timer does work but
the programmed actions are
executed at the wrong time
(e.g. 1 hour too late or too early)
The schedule timer is programmed
but does not work.
Capacity shortage
D
ISPOSAL REQUIREMENTS
Dismantling of the unit, treatment of the refrigerant, of oil and of other
parts must be done in accordance with relevant local and national
legislation.
Your product is marked with this symbol. This means that
electrical and electronic products shall not be mixed with
unsorted household waste.
Do not try to dismantle the system yourself: the dismantling of the
system, treatment of the refrigerant, of oil and other parts must be
done by a qualified installer in accordance with relevant local and
national legislation.
Units must be treated at a specialized treatment facility for re-use,
recycling and recovery. By ensuring this product is disposed off
correctly, you will help to prevent potential negative consequences for
the environment and human health. Please contact the installer or
local authority for more information.
Indoor unit for air to water heat pump system and options
C
ORRECTIVE ACTIONS
• Check if the mains power is still
connected to your installation.
• The benefit kWh rate power supply is
active (see installation manual).
Consult your local dealer.
Refer to the installation manual for a
detailed list of error codes.
Check if the clock and the day of the
week are set correctly, correct if
necessary.
In case the pr icon is not displayed,
push the pr button to enable the
schedule timer.
Consult your local dealer.
RKHBH/X008BA
4PW54225-1

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Rotex rkhbx008ba

Table des Matières