8- Connect the power cord (not supplied) :
- Unscrew the 4 screws from the plate a few millimeters where the power supply
and electronic board are installed.
- Remove the power supply unit from the box by shifting then pulling towards yourself:
the teardrop-shaped holes make it possible to extract the power supply without
removing the screws.
- Remove the transparent plastic protective sleeve.
- Attach power supply cable to power supply unit respecting polarity:
L, N, E (Live, Neutral, Earth)
Attach the three wires together the using the supplied plastic collar.
9- Connect the LED beacon strobe light power cable (2 wires) to the green connector (OUT) of the
electronic board. Respect polarity: V- (earth), V+ (+24V).
25 mm unsheathed cable.
7 mm stripped wires.
Attach the two wires together the using the supplied plastic collar.
10- Put the transparent plastic protective sleeve back in place and reposition
the power supply unit.
11- Close the control box.
All cables should be tightly wired inside the control box (no traction).
We advise against inserting excess cable length inside the control box.
Harmonys flash powered up (box open):
6
« Test » Button: press once to test the operation of the flashing beacon (start
and stop of the test mode).
- The « ~ » LED (green) indicates the presence of power.
- The « Ψ » LED (green/red) indicates the network status.
> Green = Network synchronisation OK
> Red = Network synchronization error
After the product have been powered up, it waits for a command from the mas-
ter clock.
EN