Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2. INSTALLATION

1- Determine the location where the Harmonys LED Flash beacon strobe light will be installed according to the
location of the control box: a 5-meter cable is provided to ensure the link between the 2 elements.
2- Determine the placement of the Harmonys LED Flash control box, ensuring that the power supply (mains socket)
and Ethernet cable are within reach.
3- Open the box by unscrewing the 4 screws
cover from the box.
4- Attach the control box in position using 3 screws
Note: a 4th screw can be used to mount the control box. To do so the electronic
card must first be removed.
5- Feed the network cable and the LED beacon strobe light cable through the largest
of the two cable glands (PG16). The mains power supply cable must be fed by itself
through the smallest cable gland (PG7).
6- Install the LED beacon stobe light in its final position. Ensure that it is correctly
attached to the cable clips and also to its support (e.g. the wall) to avoid vibrations.
7- Mount the information plate as close as possible to the beacon.
The equipment must not be powered on until the mounting is completed.
with a flat-tip screwdriver. Remove the
1
184
184
. Refer to the dimensions below.
2
210
97.5
2
Dimensions for mounting
View of the inside of the control box
2
PG16
PG7
2
270
37
2
2
194 mm
EN
1
5

Publicité

Table des Matières
loading

Table des Matières