6
Installation
6. 1
1
P lates
The unit is supplied with warning and attention plates as listed in the relevant table.
6. 2
2
Dimensions
6. 3
3
Location
To obtain optimal operation of the unit act as follows:
A)
Place the unit in a well ventilated room, far from heat sources.
B)
Limit the number of door openings.
C)
Make sure that the unit has good air supply and discharge.
D)
Fit a drain line to the defrost water drain connection in the lower part of the evaporator.
Solution 1
Solution 2
6. 4
4
Free room
When installing the unit leave enough free room to allow opening, correct use and easy maintenance in safe
conditions.
6. 5
5
Installation
Place the condensing unit on the floor
Install the evaporator as follows:
A)Drill the holes in the ceiling keeping the necessary distance from the wall.
A
SPO 121-123
357
SPO 221
390
SPO 135
427
B
C
337
620
427
820
427
820
Solution 3
D
614
1034
1693
Installation in a
coldroom with
more than one unit
20