OPERATION
Before assembling
1. Please open the side panel to check the parts and the technical parameters
(the manual), if the parts are incomplete or breakage, leave it as it is and inform
us or the distributor.
2. Check if the supply voltage is same as the rated one and the supply frequency
same as rated one. Make the voltage is 230±10V.
3. Make sure the water is clean with a steady hydraulic pressure, 0.2~0.6MPa
(1.5~6kgf/cm2)
4. A globe-valve is needed near the intake hose, and an extra hose connector is
needed for cleaning.
5. Over-current and leakage protection switch should be added on the feed
circuit, to protect the cooler, the wire net, and the safety of people.
INSTALL/UNINSTALL SIDE PANEL
- Loose 6 bolts with cross screwdriver.
- Pull the side panel and take it out.
- Please install as the contrary step as above.
ADD WATER
- Water can be filled into the air cooler by
continuous water supply: Connect a garden
hose to the continuous water supply inlet.
- Water can be pour into the unit from hole.
DRAIN
- Open the valve cover anti-clockwise.
- Close the valve clockwise after drain.
EN
8