Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

12
6
10
400 V
10
230 V
13
15
13
Avoid any feed pipe connection! If absolutely necessary, keep the feed line as short as
possible. Observe DIN 1988 / 1717. Additional heating cable is recommended if installed in
not frost-protected areas or in draughty locations.

Start of operation:

1. Main
switch in "0 = OFF" position, pos. (4)
2.
Fill water circuit with water
3.
Bleed water circuit, pump and heating unit, over pos. (1), pos.(2) and pos.(12)
Check that by-pass line is closed and that water circuit runs through the
heating unit!
4. R
emaining air bubbles will automatically escape through pos. (7)
5.
ECU switch to "1 = ON" position
6. C
irculation pump is switched on. Heating element is ready to work.
Repeat point 3!
7. Adjust the necessary
the heating element illuminates only if heating untit heats.
Delivery scope, ex works
( 1) Cast iron case, completely enamelled
( 2) Circulation pump 230 V
( 3) Non-return valve for water connection
( 4) Adjustable rule-thermostat
( 5) Non-return flap
( 6) Pressure relief valve 6 bar
( 7) Automatic vent valve
( 8) Thermostat
Installation
7
11
11
8
40 C°
0
1
1
40 cm
1
2
2
3
15
11
4
3
18
tempered
11
room
13
! Attention: when bleeding the hot water can escape!
return flow temperature at thermostat pos. (4). Control-light at
13
11
5
Not included in the scope of delivery
(10) 2x Residual-Current Device 400 V, 0,03 A
(11) Lock valve
(12) Shut-off valve for manual ventilation
(13) Insulation material, min. thickness 30 mm
(14) Bite protection
(15) Drain cock
(16) SUEVIA Drinking Bowls
(17) Flow control Ref.101.0309
(18) Filter
(19) Heating cable
(20) Alarm System for water circuits (Ref. 101.0308)
19
13
14
16
13
17
Installation scheme
Fractory adjustment +10° C.
20
°C
20
30
10
40
0
50
16
17

Publicité

Table des Matières
loading

Produits Connexes pour Suevia 311

Ce manuel est également adapté pour:

101.0311

Table des Matières