The Heating Unit must be mounted in a horiz
Water circuit (min. ¾", max. 1") has to be installed according to the following sequence
(see the scheme):
( 2) Mount circulation pump on heating unit.
-> Connect the pump's cable with the pump. .
( 3)
Install non-return valve
(18) Install
water filter
( 7)
Install automatic vent valve: must be at highest point of circuit in a
frost-protected-room (black knurled screw has to be in open position!)
( 6) Install
safety valve.
(16)
Install SUEVIA Drinking Bowls into the circuit connected at the top and the bottom
(15)
Install drain cock
(11) Install
shut-off valve (for the main and the bypass-management)
(12)
Install manual ventilation valve
(17)
Install Flow control Ref. 101.0309
( 5) Mount non-return flap.
( 4) Fix the adjustable return flow thermostat on metal pipeline.
( 8) Fix firmly thermostat on metal pipe.
-> Attention: when installing it you have to take care that the sensors rest against the pipe <-
(19)
Mount heating cable in frost-protected areas or in non-draughty locations.
(13)
Insulate pipes minimum thickness 30 mm, heat conductivity
(14)
Mount bite protection
(10) I
nstall residual current divices.
Heating Unit must be used with two
Unit location:
Installation must be in a dry, frost- and draught-protected room and at an accessible height.
Pipe insulation:
IMPORTANT!
Insulation of complete pipe system is indispensible,
-> minimum thickness 30 mm, heat conductivity
Water line has to be insulated against condensation of water and heat loss.
Water connection:
Water supply line 1", water outlet line 1", circuit piping: min. ¾", max. 1",
Water pressure has to be between min. 1 bar (14 psi) - max. 4 bar (58 psi)!
If water pressure is lower than recommended, install a pressure intensifier.
If water pressure is higher than recommended, install a pressure reducer valve.
Circuit length
:
Length of the insulated water tube system incl. all return pipes should not exceed 250 m (820 feet)
Circulation pump
:
Circulation pump must run on positon 3.
Circulation pump has to be bled (see page 23).
The height difference between entry and return pipeline should not exceed 7 meters.
Functioning capability of circulation pump has to be constantly checked!
Application field:
SUEVIA Heating Unit Mod. 311 is exclusively designed to keep water pipes frost-free in stables
for animals. It can only be used for warming up water, other liquids are not allowed!
16

Installation

Pay attention to the water flow direction.
Install it only horizontally. Pay attention to the water flow direction.
residual current devices - 30 mA (RCD)
ontal position on the wall!
0,04 /
W
.
mK
W
0,04 /
mK