Assembly; Installation Location; Transport; Fitting The Thermal Insulation - Stiebel Eltron SBS 800 W Manuel D'utilisation Et Installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

installation

assemBly

6.
Assembly
6.1

Installation location

»
Ensure the floor has a sufficient load bearing capacity (see
Specification table).
»
Ensure the floor is level.
»
Check the height of the room (see Specification table).
6.2

transport

The lifting eye can be fitted to the top of the appliance to assist
handling.
6.3
assembly
»
Prior to placing the instantaneous water heater cylinder in its
final location and connecting it to the heating and DHW system,
first fit the thermal insulation. For this, ensure that there is
enough space for the installation task.
6.4

Fitting the thermal insulation

Fitting the thermal insulation
8
1
7
6
6
1
L.h. thermal insulation section
2
R.h. thermal insulation section
3
Top thermal insulation section
4
Lid
5
Connector cover (1 pce.)
6
Connector cover (2 pce.)
7
Rose (7 pce.)
8
Cover strips
16
| sBs w | sBs w sol
It is recommended that the thermal insulation sections are
fitted by at least two persons. Using tensioning straps is
recommended.
»
Remove the thermal insulation sections from their carton.
»
Remove the soft foam inserts from the straight through holes in
the thermal insulation sections.
»
Push the thermal insulation sections over the connectors on the
instantaneous water heater cylinder.
»
Connect the thermal insulation sections at the front by hooking
in the hook closure strip into the last hook.
»
Position the thermal insulation sections around the instantaneous
water heater cylinder, and then connect the thermal insulation
sections at the back by hooking in the hook closure strip into
the first or second hook.
»
Adjust the thermal insulation sections by patting and pressing
down with a flat hand, so it fits snugly around the cylinder.
»
Now tighten the hook closure strip from the top until it hooks
into the final hook.
»
Position the top thermal insulation part between the thermal
insulation sections.
»
Place the lid onto the thermal insulation sections.
4
»
Fit the corresponding cover facias over the hook closure strips.
3
If required, the cover strips can be trimmed to size.
2
»
Fill the hollow spaces near the connections with the soft foam
inserts.
8
»
Push the roses and caps into the corresponding apertures.
»
Affix the additional type plate in a clearly visible position on the
5
thermal insulation.
6.5

Fitting special accessories

8
Observe the operating and installation instructions for the threaded
immersion heater BGC.
»
Fit an on-site manual air vent valve to the air vent valve
connector.
8
Cylinder vent valve
8
www.stiebel-eltron.com

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sbs 1000 wSbs 1500 wSbs 800 w solSbs 1000 w solSbs 1500 w sol

Table des Matières