STEP 5-B:
DIP SWITCH PROGRAMMING FOR EV CHARGER (EVC)
EV Charger (Breaker)
30A
40A
STEP 6: START-UP
DCC power supply
1. Supply electrical power to the DCC.
2. Wait ten (10) seconds.
3. Check if the relay is switched on.
4. Check the pilot light:
GREEN at all time: compliant installation, go to the next step.
RED: refer to the Lights code section.
Charging station power supply
1. Put the circuit breaker in the ON position.
2. Check if the electric vehicle supply equipment (EVSE) is powered:
EVSE powered: go to the next step.
EVSE not energized: check the charging station connections.
STEP 7: SECURE AND RE-ENERGIZE
Secure
1. Turn off the power on the DCC.
2. Put the cover back.
50A
60A
Re-energize
1. Supply electrical power to the DCC.
STEP 8: IDENTIFICATION
1. Identify the branch circuit breaker.
2. Register all configuration settings of the charging station in the space
provided on the cover.
APPLICATION
Electric vehicle recovery time
Following a power cut to the electric vehicle supply equipment (EVSE),
a 15 minutes delay is initiated to monitor the total consumption of the
electrical system. Power to the vehicle will then be restored if the total load
consumption is lower than 80% of the main circuit breaker rating.
Electric vehicle charging time
It is recommended to schedule the charging vehicle program during
hours of low electrical consumption to minimize interruptions to the
electric charging station.
MAINTENANCE
Do not use any cleaning solvents to clean the DCC.
9