Do not install the DCC:
- In a location with high level of risk.
- Nearby inflammable materials, explosives or fuels, chemical
products and vapors.
3. Before installation, check the DCC mounting position.
Refer to the information on the enclosure to insure proper installation.
Warranty automatically void if the DCC is installed incorrectly.
STEP 3: INSTALLATION
Wall installation
1. Remove the 4 cover screws.
2. Position the DCC at the intended location.
3. Ensure that the mounting is according with the information's
on the enclosure.
4. Fix the DCC with the anchors provided for the type of surface.
5. Check that the DCC is adequately fixed to the wall or ceiling.
STEP 4: CONDUCTOR CONNEXIONS
Consult the diagram on the next page for all details on the cable
connections configuration. This diagram is also found under the DCC
cover.
Current transformers (CT) installation and connections
1. Open the CT.
2. Install the CT around the main power cable of the panel.
3. Check the correct polarity on the CTs.
4. Connect the CT cables to the terminal block, provided for
that purpose, inside the DCC.
WARNING
EXTENSION OF CURRENT TRANSFORMERS'S WIRE
The DCC comes with 25 feet of wire. It is possible
to extend the wiring supplied with the current transformers.
Additional wire must be 300V rated, minimum 18 AWG (1mm),
4 conductors shielded twisted (ex: FT4 SHIELD. 4C FAS #18
or equivalent).
STEP 5-A:
DIP SWITCH PROGRAMMING FOR MAIN POWER SUPPLY
1. Identify the set-up section on the DCC.
2. Set up the section as per the layout corresponding to the main
power supply :
Main Circuit Breaker (Amps)
60A
70A
30A
40A
EV Charger
(Breaker)
50A
60A
Main power supply
80A
90A
100A 125A 150A
7
200A