Electrical System Diagram; Grounding - HOESCH Reviva Instructions De Montage Et D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 31
06.02

Electrical system diagram

Terminal made by the construction team should be in a form of a
permanent distributive damp-resistant socket (IP 65, at least 30 cm
over the floor, in the area under the bathtub). Before the device and
the additional equipment connect a switch disconnecting everything
(disconnecting breaks min. 3 mm) and a protective switch FI 30 mA.
In case when the system is not used for a longer time, switch it off
with the main switch (holiday, etc.). While starting it up afterwards,
disinfect the bathtub according to the description.
Do not use unit without positive earth connection (PE,
Interrupt current connection before opening!
06.03

Grounding

Equalization of potentials made by the construction team should be connected to the earth terminal on the bathtub frame. In
order to make that connection you need a green and yellow cable 4 mm².
L
1
L
2
L
3
N
PE
10A rccb
RCD 30 mA
)!
Main switch in bathroom
(Position outside area 2
according to VDE 0100 Teil 701)
Equipotential bonding 4 mm²
GB
21

Publicité

Table des Matières
loading

Table des Matières