Télécharger Imprimer la page

Environment Protection - Güde GDS 12L Traduction Du Mode D'emploi D'origine

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 9
To make sure the pressure sprayer works
perfectly without any leaks, fill the tank with clean
water and perform test spraying.
Operation (pict. 1, 5, 6, 7)
Switch adjustment (Fig.5):
a.
Variable spraying
b.
Continuous spraying
Spray pattern adjustment (Fig.7):
Turn the spraying head to adjust the spray pattern – see
Fig. 7.
Relief valve (Fig. 6):
If you hear whistling on the relief valve (Fig. 1/6), the
valve is maximally loaded. Unscrew and depressurize
the relief valve (Fig. 1/6). Then, use the pumping handle
(Fig. 1/3) to re-pump (Fig. 4) and you can restart
spraying as soon as the required pressure inside the
tank is reached.
Replace your clothes and wash your hands, face
and body after use.
Machine marking:
Product safety:
Product corresponds to
appropriate norms of the
European Community.
Bans:
Prohibition generally
(In conjunction with other icon)
Warning:
Warning/Attention
Keep safe distance
Instructions:
General mandatory sign
Use a respirator!
Use safety goggles!
Do not use the machine in
confined spaces.
Not suitable for indoor
Attention! Poisonous vapours
Please read the operating
instructions before use
Protective gloves!
Use protective overall!

Environment protection:

Proper waste disposal.
Any damaged or liquidated electric
or electronic devices must be
delivered to appropriate collection
centre.
Package:
Protect against humidity
Interseroh-Recycling
Technical Data:
Filling capacity
Weight
EC Declaration of Conformity
We,
Güde GmbH & Co. KG
Birkichstraße 6
74549 Wolpertshausen
Germany
hereby declare the conception and construction of the
below-mentioned devices correspond - at the type of
construction being launched - to appropriate basic safety
and hygienic requirements of EC Directives.
In case of any change to devices not discussed
with us the Declaration expires.
Marking of devices:
Article number:
Date/Producer signature: 28.10.2010
Signed by:
Technical Documentation: J. Bürkle FBL; QS
7
Packing cardboard material
may be delivered to collecting
centres designed thereto.
This side up
Hose length
Pressure sprayer GDS 12L
#94359
Managing Director
Mr. Arnold

Publicité

loading

Ce manuel est également adapté pour:

94359