Installation
gas pipe conect hole
1
2
12V DV power connect hole
● Once installation is complete, before final fitting check all pipe fittings for gas
leaks. Pressure the system to 13.8WCI then using a soapy solution or certified gas
1
leak detector to check for possible leaks. Always perform a leak test according to
the manufacturer's instructions.
● Slide the oven into the cabinet, then open the oven door and fix the oven with four
wood screws.
● Pay attention to fix the oven securely.
● Ensure the countertop, surrounding materials and bonding agents have a
temperature rating of no less than 193˚F (95˚C) to avoid deformation.
● Turn on the power supply only after installation has been completed.
11
2
2 ¾"
2 ¾"
(70mm)
(70mm)
"
1 ⁄
(35mm)