Installation
Installation for oven (with Furrion FGH4ZSA cooktop)
● Make the cut-out in the countertop per Fig. B. When marking the cutout, ensure to
measure the cut out from the front of the cabinets to ensure the oven vent is in the
correct position.
● Install the gas supply hose with 5/8-18UNF connection and shut off valve to the
back wall on the left hand side of the cooktop cut out.
● Two gas lines will be run for a Oven + Cooktop installation. Ensure to connect the
cooktop to the upper gas connection.
● Ensure there is ventilation hole for air circulation around the cooktop in the
cabinet.
● Ensure the countertop, surrounding materials and bonding agents have a
temperature rating of no less than 193˚F (95˚C) to avoid deformation or
discolouration.
● Before fitting the cooktop to the cavity affix the roll of sealing putty (included in the
cooktop packaging) around the underside edge. Once putty is installed completely
around the underside, remove the putty protective film and then fit the cooktop in
cut out. Push down on the cooktop edges to seal and fix the appliance securely.
1
2
Fig. B
12