Fagor BG6-05 Instructions Pour L'installation, L'utilisation Et L'entretien page 25

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

The positioning and electrical and gas installation should always be carried out by an AUTHORISED
TECHNICIAN, observing the standards of each country (For Australia AS 5601 and local authority).
It is advisable to install an extraction hood for the optimum operation of the appliance.
Place the appliance in a well-ventilated place.
Level and adjust the height of the appliance. (Fig. 2)
Possibility of installation on a low unit.
An Authorised Technician, observing the regulations in each country, must always carry out the
appliance's gas connection.
The general installation must have a stopcock and a pressure regulator and it is advisable to install a shut-
off cock on each individual appliance.
A tube of at least Ø 12 x 10 mm should be used for the appliance's gas connection, along with a ¾" nut to
connect the barbecue.
The installer must test the operation of the appliance after installation. Contact your supplier if the
appliance cannot be adjusted to perform correctly.
If the appliance is prepared for a different type of gas to the one available in the installation, you should
proceed as follows:
Cut off the gas to the appliance if connected. (All conversions of the appliance's gas circuit must always be
carried out by a QUALIFIED/AUTHORISED TECHNICIAN).
Burner conversion
Injector replacement.
Dismantle the burners' "A"
be used (Table 4)
Burner air adjustment.
Position the air regulator "B" (Fig. 4) to measurement "H" (Table 4) depending on the gas to
used.
Pilot conversion
Injector replacement
To convert to a different type of gas, please proceed as follows (Fig. 3):
Take off the lid "A" underneath which is the injector "B" to be removed and replace if with the injector
corresponding to the type of gas to be used (tighten it completely).
Turn the air regulator "C" until the flame steadies.
Put the lid "A" on again".
Minimum tap flow adjustment
IMPORTANT: Before the adjustment, the burner should be fully operational for at least 15 minutes.
For NATURAL GAS and TOWN GAS, turn the adjusting screw F (Fig. 6) anti-clockwise until the flame is
steady in the minimum position .
1.-INSTALLATION
Positioning and levelling
Gas connection
Conversion to different gases
injectors (Fig. 3) and
replace them with suitable ones depending on the gas to
24

Publicité

Table des Matières
loading

Table des Matières