Dear Client,
Please remember that the first lighting of the boiler must be handled
by our Authorized Assistance Centre (Law 37/2008) who will check
the installation and complete the guarantee.
In the event of a fire, disconnect the power supply, use an extinguisher and call
the fire fighters if necessary. After that contact the Authorised Assistance Centre.
1.0 Regulations and declaration of conformity
1.1 Safety Information
1.2 Responsibility
Instructions
• The boiler must only be fed with quality 6mm diameter pellets of
the type recommended by the manufacturer;
• Before making the electrical connection of the boiler the discharge
tubes must be connected with the flue;
• The environment where the boiler is installed must have a suffi-
cient exchange of air;
• Never open the door of the boiler while it is operating;
• When the boiler is operating, the surfaces, glass, handle and tubes
become very hot: during operation do not touch these parts wi-
thout adequate protection;
• Keep/store the pellets in a cool dry place;
• Keep the fuel and other inflammable materials off the boiler.
2.0 The Boiler Panel
Key "SET"
Key "AUTO"
Key "ON / OFF"
Key "TEMP+"
Key "TEMP-"
Key "PROG +"
Key "PROG-"
Please remember that the first lighting must be performed by our
certified Authorized Assistance Centre (Law 37/2008) that verifies
the installation and completes the guarantee. During the first lighting
the environment should be well ventilated since during the first
hours of operation unpleasant odours could develop due to the phy-
sical stabilizing of the paint and from the grease in the tubyère
wrapping.
2.1 Suggestions
G