Step-By-Step Installation - Samsung RF265B Série Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation

Step-by-step installation

STEP 1 Select a site
The site must:
• Have a solid level surface without carpeting or flooring that may obstruct ventilation
• Be out of direct sunlight
• Have adequate room for opening and closing the door
• Be away from any heat source
• Provide room for maintenance and servicing
• Have a temperature range between 50 °F (10 °C) and 110 °F (43 °C)
Clearance
See the pictures and table below and on the next page for installation space requirements.
B
A
C
18
English
Depth "A"
Width "B"
Height "C"
Overall Height
D
Model
RF265BEA*
33
1
35
3
68
/
3
70" (1778 mm)
"D"
/
" (850 mm)
2
/
" (909 mm)
4
" (1737 mm)
8

Publicité

Chapitres

Table des Matières
loading

Table des Matières