Step-By-Step Installation - Samsung RZ11M Serie Guide D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Step-by-step installation

STEP 1 Select a site
Site requirements:
• Solid, level surface without carpeting or flooring that may obstruct ventilation
• Away from direct sunlight
• Adequate room for opening and closing the door
• Away from a heat source
• Room for maintenance and servicing
• Temperature range: between 50 °F (10 °C ) and 110 °F (43 °C)
Clearance
See the pictures and table below for space requirements for installation.
B
A
Untitled-4 15
Overall Height "C"
C
Depth "A"
27
3
/
" (694 mm)
8
Width "B"
23
3
/
" (595 mm)
8
73" (1853 mm)
English
15
2020-06-30 PM 2:40:03

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Rz11m7074saRz11m7074sa/aa

Table des Matières