POWR
CYLINDER HEAD
EXPLODED DIAGRAM
15 Nm (1.5 mSkg, 11 ftSlb)
1st
2nd
36 Nm (3.6 mSkg, 25 ftSlb)
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
CYLINDER HEAD REMOVAL
Muffler
1
Spark plug
2
Water hose
3
Bolt (with washer)
4
Cylinder head
CYLINDER HEAD
25 Nm (2.5 mSkg, 18 ftSlb)
Q'ty
Follow the left "Step" for removal.
Refer to "MUFFLER".
2
1
NOTE:
10
Tighten the bolts in sequence and two
steps of torque.
1
Reverse the removal steps for
installation.
25
Service points