POWR
ENGINE UNIT REMOVAL
EXPLODED DIAGRAM
7 Nm (0.7 mSkg, 5.1 ftSlb)
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
ENGINE UNIT REMOVAL
Engine hood assembly
Oil tank assembly
Fuel tank assembly
Ventilation hose
1
Battery lead
2
Wire clamp
3
Lead coupler
4
Electrical box
5
Choke cable
6
Throttle cable
7
Housing grease nipple plate
8
Coupling cover
9
Water hose
ENGINE UNIT REMOVAL
1 Nm (0.1 mSkg, 0.7 ftSlb)
Q'ty
Follow the left "Step" for removal.
Refer to the "ENGINE HOOD
REMOVAL" section in chapter 8.
Refer to the "OIL TANK AND FUEL
TANK REMOVAL" section in chapter 4.
Refer to the "DECK" section in chapter 8.
2
4
2
1
1
1
1
1
3
19
17 Nm (1.7 mSkg, 12 ftSlb)
4 Nm (0.4 mSkg, 2.9 ftSlb)
Service points