UWE JetStream LIDO Instructions De Montage Et Mode D'emploi page 14

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation (picture number 1 ABS version)
Position the wall niches of the jet nozzles as shown in the drawings
Function
Position first stage wall and wall components flush with structural concrete.Remove protective covers only when ready to lay tiles
/ mosaics. In the case of a concrete/liner pool first stage components may project in order to compensate for cement render or liner
insulation thickness. First stage components must be accessible from the outside of the pool wall to allow for the installation of
pipes and air suction lines later. Locate the pneumatic switch housing in a convenient position 15-20 cm below water level.
If the JETSTREAM LIDO is to be fitted with two jets, the second component should be located at a lateral distance approximately
1.5 m from the first. It is advisable to make provision for protecting the pneumatic tube (PVC 2/4 dia.) and air inlet tubes (PVC 12/
21 dia.) by placing in protective conduit or through adjacent cable/ventilation ducts.
Tile plan (picture number 2a ABS version)
Render and tile to inner edge. Render & tile 6 cm max.
Pools with plastic liner (picture number 3a ABS version) )
Proceed as shown in fig. 3a
Steel, aluminum and polyester pools (picture number 1 red bronze version)
Proceed as shown in fig. 4 and fig. 4a
Pneumatic switch (picture number 5 red bronze version and ABS version)
1a
20-35
optimal 25
Ø17
dimensions in cm
Concrete
Shuttering
24
Sticker
„top"
nozzle housing
stopper 2"
24
Pneumatics
switch
Shuttering
housing
screw if
required
M 6x35
14
2a
Protective sleeve
for pneumatic tube
Wall thickness
24 -100 cm
3a
24
Suction
housing
Clamping
frame
stopper 2"
screw
Shuttering
Render & tile
to inner edge
Render & tile
6 cm max
liner
screw M5
One rubber
gasket to
either side
of liner

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Jetstream lido 2

Table des Matières