4. Installing the refrigerant piping
 P100-P140
D
A
Fig. 4-3
A
C
D
E
F
G
A Stop valve <Liquid side>
B Stop valve <Gas side>
C Service port
D Open/Close section
Fig. 4-4
(1)
B
A
C
G
H
J
I
E
D
Fig. 4-5
A Valve
H Double spanner section
B Unit side
(Do not apply a spanner other than to this section. Doing
C Cap
so would cause coolant leaks.)
D Local pipe side
I Seal section
E Pipe cover
(Seal the end of the heat insulation material at the pipe
F Service port
connection section with whatever seal material you have
G Wrench hole
on hand so that water does not infi ltrate the heat insula-
tion material.)
4.6. Addition of refrigerant
• Additional charging is not necessary if the pipe length does not exceed 20 m for
P100 and 30 m for P125-P140.
• If the pipe length is exceeded, charge the unit with additional R410A refrigerant
according to the permitted pipe lengths in the following table.
* When the unit is stopped, charge the unit with the additional refrigerant
through the liquid stop valve after the pipe extensions and indoor unit have
been vacuumized.
When the unit is operating, add refrigerant to the gas check valve using a
safety charger. Do not add liquid refrigerant directly to the check valve.
6
C
B
A Front piping cover
B Piping cover
C Stop valve
E
D Service panel
E Band radius : 100 mm-150 mm
B
D
E
F
G
E Local pipe
F Sealed, same way for gas side
G Pipe cover
(2)
B
F
A
C
G
H
I
E
D
Fig. 4-6
4.3. Refrigerant piping (Fig. 4-3)
 For P100-P140
Remove the service panel D (three screws) and the front piping cover A (two
screws) and rear piping cover B (two screws).
1 Perform refrigerant piping connections for the indoor/outdoor unit when the out-
door unit's stop valve is completely closed.
2 Vacuum-purge air from the indoor unit and the connection piping.
3 After connecting the refrigerant pipes, check the connected pipes and the indoor
unit for gas leaks. (Refer to 4.4 Refrigerant pipe airtight testing method)
4 A high-performance vacuum pump is used at the stop valve service port to main-
tain a vacuum for an adequate time (at least one hour after reaching –101 kPa
(5 Torr)) in order to vacuum dry the inside of the pipes. Always check the degree
of vacuum at the gauge manifold. If there is any moisture left in the pipe, the de-
gree of vacuum is sometimes not reached with short-time vacuum application.
After vacuum drying, completely open the stop valves (both liquid and gas) for
the outdoor unit. This completely links the indoor and outdoor coolant circuits.
• If the vacuum drying is inadequate, air and water vapor remain in the coolant
circuits and can cause abnormal rise of high pressure, abnormal drop of low
pressure, deterioration of the freezing machine oil due to moisture, etc.
• If the stop valves are left closed and the unit is operated, the compressor and
control valves will be damaged.
• Use a leak detector or soapy water to check for gas leaks at the pipe connec-
tion sections of the outdoor unit.
• Do not use the refrigerant from the unit to purge air from the refrigerant lines.
• After the valve work is completed, tighten the valve caps to the correct torque:
20 to 25 N·m (200 to 250 kgf·cm).
Failure to replace and tighten the caps may result in refrigerant leakage. In
addition, do not damage the insides of the valve caps as they act as a seal to
prevent refrigerant leakage.
5 Use sealant to seal the ends of the thermal insulation around the pipe connec-
tion sections to prevent water from entering the thermal insulation.
4.4. Refrigerant pipe airtight testing method
(1) Connect the testing tools.
• Make sure the stop valves A B are closed and do not open them.
• Add pressure to the refrigerant lines through the service port C of the liquid
stop valve A.
(2) Do not add pressure to the specifi ed pressure all at once; add pressure little by
little.
1 Pressurize to 0.5 MPa (5 kgf/cm
pressure does not decrease.
2 Pressurize to 1.5 MPa (15 kgf/cm
pressure does not decrease.
3 Pressurize to 4.15 MPa (41.5 kgf/cm
perature and refrigerant pressure.
(3) If the specifi ed pressure holds for about one day and does not decrease, the
pipes have passed the test and there are no leaks.
• If the surrounding temperature changes by 1 °C, the pressure will change by
about 0.03 MPa (0.3 kgf/cm
2
G). Make the necessary corrections.
(4) If the pressure decreases in steps (2) or (3), there is a gas leak. Look for the
source of the gas leak.
4.5. Stop valve opening method
The stop valve opening method varies according to the outdoor unit model. Use the
appropriate method to open the stop valves.
(1) Gas side of P100-P140 (Fig. 4-5)
1 Remove the cap and turn the valve rod counterclockwise as far as it will go with
the use of a 5 mm hexagonal wrench. Stop turning when it hits the stopper.
(ø 15.88: Approximately 13 revolutions)
2 Make sure that the stop valve is open comletely and rotate the cap back to its
original position.
(2) Liquid side of P100-P140 (Fig. 4-6)
1 Remove the cap and turn the valve rod counterclockwise as far as it will go with
the use of a 4 mm hexagonal wrench. Stop turning when it hits the stopper.
(ø6.35: Approximately 4.5 revolutions) (ø9.52: Approximately 10 revolutions)
2 Make sure that the stop valve is open completely and rotate the cap back to its
original position.
Refrigerant pipes are protectively wrapped for P100-P140
• The pipes can be protectively wrapped up to a diameter of ø90 before or after
connecting the pipes. Cut out the knockout in the pipe cover following the groove
and wrap the pipes.
Pipe inlet gap for P100-P140
• Use putty or sealant to seal the pipe inlet around the pipes so that no gaps re-
main. (If the gaps are not closed, noise may be emitted or water and dust will
enter the unit and breakdown may result.)
* After charging the unit with refrigerant, note the added refrigerant amount on
the service label (attached to the unit).
Refer to the "1.5. Using R410A refrigerant air conditioners" for more informa-
tion.
• Be careful when installing multiple units. Connecting to an incorrect indoor unit
can lead to abnormally high pressure and have a serious effect on operation
performance.
Permitted
Permitted
Model
pipe
vertical
length
difference
P100
-50 m
-30 m
P125,
P140
2
G), wait five minutes, and make sure the
G), wait fi ve minutes, and make sure the
2
2
G) and measure the surrounding tem-
Additional refrigerant charging amount
21 - 30 m
31 - 40 m
41 - 50 m
0.6 kg
1.2 kg
1.8 kg
0.6 kg
1.2 kg