dirna Bergstrom bycool blue line REVOLUTION 12 V Instructions De Montage page 38

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

REVOLUTION
EN
Place the filler plug in the tank, cut to
26
100mm; insert "T" and connect the pipe
with the smaller diameter to this, mark
with white tape and check that the
curve radius is big enough to avoid
constriction.
Connect sheathed wiring to the
27
evaporative boxes and water inlet pipe.
A. Connect the impulsion pipe to the
pump which comes from the evaporative
unit.
B. Connect pump wiring and level.
Connect the battery wiring as indicated.
28
A
38
®
26
27
B
24

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bycool blue line revolution 24 v

Table des Matières