2. Turn the cable adjusters until the discharge chute
points straight forward, and the cables are tight.(Fig.
85 )
3. Loosen the cable adjusters ¼ turn to make the
cables less tight.
To remove the wheels
1. Remove the wheel pin (A) and the retainer pin (B).
2. Remove the wheel from the axle (C).(Fig. 86 )
To adjust the tension of the
continuous tracks (for ST 424T/427T/
430T only)
Note: Tools that are necessary for this task: a 9/16"
deep socket, a 9/16" wrench and a 5 kg (10 lbs) weight.
1. Loosen the locking screw (A) 1 turn.
891 - 002 -
2. Remove the rear locknut (B) to give access to the
adjustment nut.(Fig. 87 )
3. Put a 5 kg (10 lbs) weight (C) on top of the
continuous track, in the center between the 2
wheels.
4. Turn the adjustment nut (B) until the distance (D)
between the continuous track and the steel plate is
between 3.175 and 6.350 mm (0.125 and 0.250 in).
wide.(Fig. 88 )
5. Attach the locking screw (A) and then the rear
locknut (B).
To clean the product
•
Clean plastic parts with a clean and dry cloth.
•
Do not use a high pressure washer to clean the
product.
•
Do not flush water directly on the motor.
•
Use a brush to remove leaves, grass and dirt.
23