INSTALLATION
1. Carefully remove unit from carton or crate. Remove
any packing material from unit. On stainless steel
panels, the protective material should be removed
before the unit is installed.
2. Set skillet in position where electrical services are
nearby. Comply with clearances stated on the
specification sheet. Ensure there is sufficient
clearance between skillet and back wall.
3. Table-top models must be positioned on a firm, level
stand or existing counter top, and bolted in place,
using the four 5/16"-18 rods and nuts included with
the skillet. These models are supplied with four
5/16"-18 weldnuts welded to underside of the base
as illustrated below.
Make four 3/8" holes in an existing stand or countertop,
in order to secure the base of the skillet. Once the holes
are made, screw the threaded rods into the ferrules on
the bottom of the skillet base. Then insert the threaded
rods through the holes on the stand or countertop.
Thread the nuts onto the threaded rod and tighten to
secure base. Once secure and level, apply a seal of
silicon, to the entire edge of the base at the countertop.
This will prevent food particles from entering underneath
the skillet base. Screw the tilt handle into the threaded
mounting block welded to the side of the skillet.
ELECTRICAL CONNECTION
FUSED DISCONNECT
A separate fused disconnect (supplied by installer) is
required for this equipment. Follow chart below to
properly size disconnect.
WIRE CONNECTION
SET-10: Remove the screw at the rear of the console cover,
and remove the cover. A wiring diagram is affixed to the
underside of the cover. Feed conduit enclosed permanent
copper wiring through the cut-out in the rear of the
console, and fasten to the three connection terminal block.
Be sure to connect the ground wire to the separate ground
terminal connector (ground lug). Replace the console
cover and secure it with the screw.
SET-15: Remove the screw at the rear of the console cover,
and remove the cover. A wiring diagram is affixed to the
underside of the cover. Install a watertight fitting in the cut-
out in the rear of the console. Feed conduit enclosed
permanent copper wiring through fitting. Connect the
power and Neutral wires as shown to the terminal block.
Be sure to connect the ground wire to the separate ground
terminal connector (ground lug). Replace the console
cover and secure it with the screw.
INSTALLATION CHECK
Although the skillet has been thoroughly tested before
leaving the factory, the installer is responsible for
ensuring the proper operation of the skillet once
installed.
1. Ensure that electric supply to the skillet is turned on.
2. Remove the lift-off cover.
3. Place the skillet's power on/off switch to the "on"
position.
4. Dial the thermostat switch to the maximum setting.
The indicator light near the thermostat switch should
be illuminated until the set temperature is reached,
then cycle on and off as the thermostat cycles on
and off to maintain the set temperature.
5. Pour 2 gallons (8 liters) of cool tap water into
preheated skillet pan.
6. It should take approximately 3 minutes for the water
to begin to simmer. Shortly, the water should be
bubbling uniformly across the entire cooking
surface.
7. Dial the thermostat switch back to the "off" position.
8. Tilt skillet to drain the water out of the skillet pan,
into an appropriate pan or other container.
9. Lower the skillet, place the power on/off switch to
the "off' position.