Dry Cutting; To Start The Product - Husqvarna K1 PACE Manuel D'utilisation

Masquer les pouces Voir aussi pour K1 PACE:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

When wet cutting, make sure to collect the waste
water safely.
To decrease dust during operation
The product has a wet cutting kit to decrease harmful
dust in the air during operation. The wet cutting kit has
low water consumption.
When possible, use wet cutting blades with water
Diamond blades for wet cutting on
cooling. Refer to
page 16 .
Adjust the water flow with the valve. The correct flow
is different for different types of tasks.
Make sure that the water pressure is correct. Refer
Technical data on page 32 . If the water hose
to
comes off at the supply source, the supplied water
pressure can be too high.
To connect the coolant water
1. Connect the water hose to the water supply (A).
A
2. Turn the water valve (B) to start or stop the water
flow.
3. Examine the water connection and the hose for
leakage.
4. Make sure that the water pressure is not higher
than the maximum permitted water pressure, refer
Technical data on page 32 .
to

Dry cutting

When dry cutting, lift the blade out from the cut each
30–60 seconds and let it rotate in the air for 10
seconds to let it cool.
Use Vac equipment if possible.

To start the product

1. Do a check of the power trigger and power trigger
To do a check of the power trigger
lockout. Refer to
lockout on page 27 .
1598 - 002 - 14.02.2022
2. Put the battery in the battery holder.
3. Push on the lower part of the battery until you hear
B
a click sound. If the battery does not move into the
battery holder easily, it is not attached correctly into
the battery holder.
25

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

K1 pace rescue

Table des Matières