Step 2 Placing Ladder Into Prepared Opening - Werner AH2210 Série Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Step 2 PLACING LADDER INTO PREPARED OPENING

INCLUDED
COMPONENTS
(1) Ladder Assembly
DO NOT remove the nylon tie holding the ladder
sections together until after the ladder has been
properly installed and secured.
Be careful when using a stepladder to climb into and
out of the overhead space.
1.
ATTACHING PULL CORD: (See Figure F)
a.
Thread small end of supplied pull rope through
pre-drilled hole in door and tie to the washer.
You can adjust length of pull rope after ladder
is completely installed.
2. RAISING LADDER INTO ROUGH OPENING:
a.
One person should be in the attic before
raising the ladder.
b.
Raise ladder through rough opening at an
angle so the ladder clears the temporary
support boards. (See Figure G)
c.
Position the ladder in the rough opening so it
rests securely on the temporary support
boards. Slide the ladder so that the hinged
end of the wood frame is resting tightly against
Header "A" (See Figure H). Make certain the
plywood door is not prevented from opening by
the support boards. (See Figure I) If it is
obstructed check the position of the support
boards from Step 1.
Do not place any weight on the ladder until
permanently installed in Step 3, page 8.
The person in the overhead space must remain
there until installation is completed.
6
INCLUDED
FASTENERS
(1) 1/4"-20
Washer
(1) Pull Rope
WARNING
WARNING
WARNING
ADDITIONAL
MATERIALS
NEEDED
Shims
(4) #8 Deck Screws, 2"
Tie to
Washer
Figure F
2nd Temporary
Support
Figure G
No Gaps
Figure H
2nd Temporary Support Board
View from below
Figure I
TOOLS
NEEDED
Stepladder
Tape Measure
Hammer
Drill
Phillips Driver
1st Temporary
Support
Header A
Hinged End
View from above
Approximately 1/8" Gap
Door

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ah2510 sérieAe2210 série

Table des Matières