1.76
8.30
.90" Dia.
.25" Dia.
(4) Holes
Fig. 3.e
Side Installation Horizontal Duct
1/3 Height
Fig. 3.f
Side Installation Vertical Duct
=
=
Fig. 3.g
Important: DO NOT introduce steam
into a duct that has interior insulation.
UP
2" Sq.
3" Sq.
Height >8"
8" Min
Steam Nozzle (optional)
The optional steam nozzle (See Fig. 3.h. and Table 3.d.) can be
used for horizontal surface installations (i.e. the bottom of a
horizontal duct) or vertical surface installations (See Fig. 3.i.).
A condensate hose is required. To install the steam nozzle,
cut a 2-1/2" round hole in the duct. Apply silicone sealant to
the mounting plate and insert the nozzle through the hole
and secure with sheet metal screws. Connect the steam and
condensate hoses using the hose clamps supplied. Select
an accessible location on the duct, allowing at least 36" of
straight duct (no elbows or obstructions) after the point where
the steam nozzle will be installed and the clearances can be
maintained as per the following drawings.
B
B
A
A
A
A
B
Steam Inlet
H
G
F
Condensate drain
Fig. 3.h
Inches
A
1.24"
31.5 mm
B
1.96"
50 mm
C
2.20"
56 mm
F
2.26"
57.5 mm
E
3.93"
100 mm
F
0 0.31"
0 8 mm
G
0 0.86"
0 22 mm
H
0 1.18 "
0 30 mm
I
0.87"
22 mm
Tab. 3.d
9
ENG
C
E
D
I
Apply silicone
sealant to this face
mm
Form No. 5500-32 Rev C
Code: +0700092EN REV 3.2 04APR2022