FALMEC Diamante 90 Livret D'instructions page 19

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 27
Phase 3
To avoid any unhooking of the hood fix it to the wall with the screws and wall anchors sup-
plied as follows:
- through the holes on the back of the hood and any strap on the cover.
- Insert in pipe union D pipe E (fig. 3)
- Should the fixing include a rear flue see fig. A.
Phase 4 (optional)
- Position chimney (G) and extension (H) as shown in fig. 04.
- Insert in G extension H, making it slip until the required height is reached.
- When happy with the location, lean bar L against the wall, check with a spirit level the
horizontal alignment and mark two fixing points at the ends of the bar.
- Drill a hole, insert 2x4 mm. wall anchors and fix bar L with the screw provided.
- Screw extension H to bar L Using screws M.
17

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Diamant 1430Diamante

Table des Matières