Kobe Range Hoods CH7930SQB Manuel D'installation Et Mode D'emploi page 14

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

***This installation only applied with the purchase of a duct cover.
Preparation before Installation
NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE
VENT OPENING.
Decide the location of the venting pipe from the hood to the outside. Refer to Figure 13.
-
A straight, short venting run will allow the hood to perform more efficiently.
-
Try to avoid as many transitions, elbows, and long run as possible. This may reduce
-
the performance of the hood.
Use duct tape to seal the joints between pipe sections.
-
If necessary, prepare back wall frame with cross framing lumber for secure installation.
-
Using references on Table 2 and measurements on Page 22-23, decide the level of the
-
lumber. Refer to Figure 14.
Hood Preparation before Installation
Temporarily wire the hood to test for proper operation before installing.
-
Peel protective film off the hood and the duct cover (if any).
-
Cut the multi vent exhaust according to the size of the venting pipe. Refer to Figure 15.
-
6" Round Vent
WALL MOUNT INSTALLATION – TOP VENT
Figure 13
7" Round Vent
12
Figure 14
3-1/4" x 10" Vent
Figure 15

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ch7936sqbCh7942sqbCh7948sqbCh-179 série

Table des Matières