Page 1
PAIA 60 INSTALLATION MANUAL - SHOWER ENCLOSURE MANUEL D’INSTALLATION - CABINE DE DOUCHE MANUAL DE INSTALACIÓN - PUERTA DE DUCHA Questions, problems, need help? Call our customer service department at 1-866-839-2888, 9 a.m. - 5 p.m., EST, Monday - Friday Questions, problèmes ou besoin d’aide?
Page 2
DO NOT START WITH THIS INSTALLATION MANUAL 1) FIRST, INSTALL YOUR SHOWER BASE (AN INSTALLATION MANUAL CAN BE FOUND IN THE SHOWER BASE PACKAGE). 2) SECOND, INSTALL YOUR SHOWER SIDE PANEL, IF APPLICABLE (AN INSTALLATION MANUAL CAN BE FOUND IN THE SIDE PANEL PACKAGE). 3) THIRD, INSTALL YOUR SHOWER ENCLOSURE (USING THIS MANUAL).
TABLE OF CONTENT TABLE DES MATIÈRES TABLA DE CONTENIDOS TABLE OF CONTENT ................3 WALL-TO-WALL DIMENSIONS ............13 TABLE DES MATIÈRES ................3 MESURES MUR-À-MUR ................13 TABLA DE CONTENIDOS ................3 MEDIDAS DE PARED-A-PARED .............13 SAFETY INFORMATION ................4 WALL TRACK INSTALLATION ..............14 INFORMATION SUR LA SÉCURITÉ ............4 INSTALLATION DE LA GLISSIÈRE ............14 INFORMACIÓN DE SEGURIDAD ...............4 INSTALACIÓN DEL RIEL DE PARED ............14...
SAFETY INFORMATION INFORMATION SUR LA SÉCURITÉ INFORMACIÓN DE SEGURIDAD CAUTION Please carefully read the following important safety information before handling or installing this shower. There is a risk of serious injury while handling this product. To minimize these risks, please note: •...
SAFETY NOTICE AVIS DE SÉCURITÉ AVISOS DE SEGURIDAD NOTICE • Any modification or alteration from what is specified in this instruction manual will void any and all warranty on this product. • The distributor is not responsible for any damage to the unit or personal property caused by improper installation. If you disregard instructional warnings, you will void your warranty and possibly deal with water damage.
PART LIST LISTE DES PIÈCES LISTA DE PIEZAS PART # DESCRIPTION QUANTITY CODE # DE PIÈCE DESCRIPTION QUANTITÉ CODE PARTE # DESCRIPCIÓN CANTIDAD CÓDIO Wall track Glissière Chrome / Chrome / Cromo: 99STR2020 Riel de la pared Fixed panel Panneau fixe Chrome / Chrome / Cromo: 99SG3710-WM Panel fijo Support bar anchor...
REVERSIBILITY RÉVERSIBILITÉ REVERSIBILIDAD This instruction is drawn up for a door opening from right to left (see illustration A). For an installation for a door opening from left to right (see illustration B), use the same instructions, but switch around the panels: mirror effect. Utilisez ces instructions pour une ouverture de la porte de droite à...
SHOWER DIMENSIONS DIMENSIONS DE LA DOUCHE DIMENSIONES DE LA DUCHA Measurements Mesures Medidas Shower height Hauteur de la douche Altura de la ducha Shower width Largeur de la douche Anchura de la ducha Fixed panel width Largeur du panneau fixe Ancho de panel fijo Door panel width Largeur de la porte...
SHOWER INSTALLATION: OVERVIEW IF USING TILE WALL INSTALLATION DE LA DOUCHE: VUE D’ENSEMBLE AVEC MUR DE TUILE MONTAJE DE LA DUCHA: VISIÓN GENERAL CON PARED DE AZULEJOS A. Before you start the installation of your product consult the illustration A below showing a side-view of the completed installation. B.
WALL-TO-WALL DIMENSIONS MESURES MUR-À-MUR MEDIDAS DE PARED-A-PARED • Measure the thickness of your tiles on either side before installing the metal tracks. A thicker tile will limit your space to install the shower panels. • Make sure to have a distance tile to tile (D) between 1485mm (58 7/16 in) min. and 1525mm (60 1/16 in) max. (see image).
WALL TRACK INSTALLATION INSTALLATION DE LA GLISSIERE INSTALACIÓN DEL RIEL DE PARED A-B. Position the wall track (A) as illustrated. Level the track (A) and mark the track holes positions. C. Remove the track and drill pilot holes in the marked locations with a ø5/16” (8mm) drill bit. D.
FIXED PANEL AND SUPPORT BAR INSTALLATION INSTALLATION DU PANNEAU FIXE ET DE LA BARRE DE SUPPORT INSTALACIÓN DEL PANEL FIJO Y DE LA BARRA DE SOPORTE A. Insert the fixed panel bottom seal strip (L) on the base of the fixed panel (B). Cut the surplus part with a cutter, about 1 9/16” (40mm) from the panel’s edge.
Page 16
FIXED PANEL AND SUPPORT BAR INSTALLATION INSTALLATION DU PANNEAU FIXE ET DE LA BARRE DE SUPPORT INSTALACIÓN DEL PANEL FIJO Y DE LA BARRA DE SOPORTE If L < 58 7/16” (1485mm) you can cut the support bar (E) to adequate size. Only cut the side with no holes! B.
Page 17
FIXED PANEL AND SUPPORT BAR INSTALLATION INSTALLATION DU PANNEAU FIXE ET DE LA BARRE DE SUPPORT INSTALACIÓN DEL PANEL FIJO Y DE LA BARRA DE SOPORTE A-B. Completely remove the guide (O) and the support bar (E). C. Completely remove the fixed panel (B). D.
Page 18
FIXED PANEL AND SUPPORT BAR INSTALLATION INSTALLATION DU PANNEAU FIXE ET DE LA BARRE DE SUPPORT INSTALACIÓN DEL PANEL FIJO Y DE LA BARRA DE SOPORTE A. Drill a pilot hole for the sliding door guide (O) using a ø1/8” (3mm) drill bit. B.
Page 19
FIXED PANEL AND SUPPORT BAR INSTALLATION INSTALLATION DU PANNEAU FIXE ET DE LA BARRE DE SUPPORT INSTALACIÓN DEL PANEL FIJO Y DE LA BARRA DE SOPORTE A-B. Place the fixed panel (B) into the wall track (A) and put back the sliding door guide (O). C.
SHOWER DOOR INSTALLATION INSTALLATION DE LA PORTE DE DOUCHE INSTALACION DE LA PUERTA DE DUCHA A-B. Install the 2 door rollers (G) on the door panel (I), making sure the squared side of the rollers (G) face up vertically as clip and cap will be installed onto the roller in future steps.
LEVELING THE GLASS PANEL NIVELAGE DU PANNEAU DE VERRE NIVELANDO EL PANEL DE CRISTAL After the wheels have been installed, adjust the level of the glass panel using the eccentric mechanism of the rollers. Fit the bigger Allen key in the center of the inner roller, hold it in place, do not turn it, as it will loosen the wheel.
SEAL STRIPS INSTALLATION INSTALLATION DES BANDES D’ÉTANCHÉITÉ INSTALACIÓN DE LAS TIRAS DEL SELLO A. Install the clips and caps (R) onto the rollers (G). B-C. Install the 2 glass panel vertical seal strips (N). Install the door vertical seal strip (J) on the closing end. D-E.
HANDLE INSTALLATION INSTALLATION DE LA POIGNÉE INSTALACIÓN DE LA MANIJA A-B. Using silicone, install the decorative track (Q) in front of the door panel. Slide the decorative caps (P) onto the track. C-D. Fix the fixed panel (B) by drilling guide holes through the wall tracks (A) and screwing it in place using fittings (FF), screws (DD) and caps (EE). E.
SEALING SCELLAGE SELLADO Ensure that the door closes tightly and opens smoothly. Ensure that there is a firm connection between the fixed panel(s) and the support bar. Apply a clear silicone water sealant around the outside perimeter of any fixed shower components. Allow 24 hours for silicone to dry. Improper application of silicone sealant may cause your shower to leak.
CARE AND MAINTENANCE TRAITEMENT ET ENTRETIEN CUIDADO Y MANTENIMIENTO For the daily maintenance, use a wet cloth and a soft liquid cleaner. Never use abrasive cleaners containing some acetone, chlorine or strong bleach, scrapers, metallic brushes, nor other objects or the products which can graze or tarnish surfaces.
LIMITED Product Warranty The DISTRIBUTOR is a distributor of the following Products: • Shower Doors (warranty period 5 years). • Acrylic Surfaces (warranty period 5 years against blistering, cracking or chipping in the acrylic surface). Acrylic Shell Structure (warranty period 5 years against loss of water through fiberglass laminate of the acrylic body). •...