8.2. On a concrete slab
Type: 10 cm thick reinforced concrete slab
Recommended concrete proportions: 150 kg of cement per m³ of sand mixed with a concrete mixer.
Leave pockets using polystyrene strips or wooden rafters in a rectangular area 15 cm wide x 14 cm high for the horizontal rails
and end wedging.
The slab dimensions must exceed the pool dimensions by at least 30 cm all around the pool.

9. Assembling the straps

Ensure that the ground has been correctly levelled before installing the straps. It is imperative that they lie flat on the ground.
If the pool is installed on a concrete slab, leave pockets for the strap fastening bolts. 18 mm diameter holes are sufficient.
IMPORTANT: use the screws on top and the nuts on the bottom to assemble. A screw is provided for each hole.
The assembly process includes one strap at the end and another one in the middle of each post.

10. Assembling the structure

To ensure the correct spacing and alignment, fasten the top plates on to the support legs, install the ledge pieces without
fastening them and slide in the bottom rails. Then proceed with assembling the pressure plates before covering them with
sand:
0341
VARUNA-SAPHIR-CANYON Oval
7254
Centre strap
7224 or 7244 or 7264
End strap
6254
Pressure plate
0623
M8 nut
1212 or 1615 or 1618
Metal rail
106
0923
M8 x 20
S (see 8.1)