Bosch+Sohn boso Carat professional Mode D'emploi page 75

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Calibration checks - Testing instructions
(for trained specialist staff only)
Testing
1.) Remove batteries.
2.) Hold start button pressed down and
insert batteries.
3.) Release start button.
The monitor is now ready for testing;
the current pressure is displayed in the
SYS, DIA and PULS fields. The start but-
ton is illuminated green.
4.) Perform test for deviation of pressure
display and pressure circuit integrity
(observe setting time for cuff – at least
30 seconds) in the usual manner.
5.) Switch off monitor by pressing the
start button again and re-establish all
original connections.
C) Safety seal
As a safeguard, the upper and lower
parts of the housing can be joined
with a safety seal. Alternatively, a hole
drilled in the lower side of the monitor
for the connecting screw for the hou-
sing can be sealed for safety.
The device must not undergo service
or maintenance while it is in use.
EN
75

Publicité

Table des Matières
loading

Table des Matières