Zephyr Napoli ZNA-M90DS Guide D'utilisation, D'entretien Et D'installation page 17

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ZEPHYRONLINE.COM
Mounting the Hood
11. Lift hood and align the (4) pre-installed mounting screws located on top of the unit body (FIG. C4)
with the (4) key holes on the bottom of support frame. Slide hood towards the narrow end of key
holes to lock into place. Hand tighten each of the (4) screws with a screwdriver to secure hood to
bottom support frame. Further secure bottom support frame to unit body by one M4 x 12 safety
screw (FIG. H).
12. Remove tape securing electronics mounting bracket to hood. Remove (3) screws from top of hood
body and set screws aside. Position electronics mounting brackets and secure to hood body using
the (3) previously removed screws (FIG. G).
13. Install electrical and duct work. Seal duct work with aluminum duct tape.
14. Unwrap the blue antenna wire and position it behind the duct cover from step 16-18. There is no
need to secure it.
15. Power up hood, verify all functions and check for leaks around duct tape.
16. Assemble top duct covers (with louver holes) together over top support frame, secure top duct
covers together by magnetic strips.
NOTE: If using hood in ductless recirculating mode you must install the air diverter plate to the top
support frame prior to assembling the duct covers. Turn to page 19 for more details.
17. Secure top duct covers to top support frame by using (4) 3/16 x 1/4 screws (2 screws for each top
duct cover). (FIG. I1).
18. Assemble bottom duct covers together over top duct covers and secure together by magnetic
strips. Bottom duct covers should rest on top of the hood body.
Napoli Use, Care, and Installation Guide
FIG. G
Installation Instructions
FIG. H
17

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Napoli zna-e42ds

Table des Matières