10
[Fig. 10.5]
A
E
D
I
B
H
I
[Fig. 10.6]
F
G
H
B
C
D
E
14
G
F
C
J
A
L
I
J
M
K
10.5
A
Then, wind the sealing material to the pipe, using the
mark on the paper to properly align it.
B
C
D : Mark
E
rial meet at the top.
F : Inside the unit
G : Pipe cover
H
L
I
J
per is at the top.
K : Water stopper
K
L
10.6
A : Enlarged view
B : Sealing material attachment process
K
C
D
E
J
F : Panel assy W
I
G
H
I
J
K
L : Put sealing material inward.
M