Requirements For Installation Location - OSO HOTWATER DI 200-300 l Instructions De Montage

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

3.3.1 Delivery
The product should be transported carefully as
shown, with packaging. Use the handles in the
box.
!
Pipe stubs, valves etc. should not be used to lift
the product as this could cause malfunctions.
3.4 Requirements for installation location and
positioning
The product should be placed in a room with a drain, in accordance with the wetroom
!
standard / latest TEK. Alternatively, fit an automatic stop valve with sensor and overflow
from safety valve to drain.
!
The product should be placed in a dry and permanently frost-free position.
The product should be placed on a floor or wall suitable for the total weight of the product
!
when in operation. See type plate.
The product must have a clearance for servicing of 40 cm in front of the cover / 10 cm over the
!
mixer valve.
!
The product should be easily accessible in the home for servicing and maintenance.
CAUTION
Min.
40 cm
CAUTION
!
Min. 40 cm
Min. 10 cm
7

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Delta inox di 200Delta inox di 300

Table des Matières