KitchenAid 720-0954R Instructions D'installation Et Guide D'utilisation Et D'entretien page 44

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4.
Replace with the Natural gas orifice.
IMPORTANT: Check that the NG orifice is properly
installed inside of the valve.
5.
Reinstall the sear burner. Make sure the sear burner tube
is inserted into the gas valve, as shown.
6.
Reinstall the two screws to the rear of the searing burner.
7.
Use a screwdriver to reinstall the igniter pin.
8.
Open the manual shutoff valve in the gas supply. The
valve is open when the handle is parallel to the gas pipe.
A.
B.
9.
Test all connections using an approved non-corrosive
leak-detection solution. Bubbles will show a leak. Correct
any leak found
Record Conversion
The LP appliance nameplate is located inside the grill cabinet
on the left-hand side. Once converted, place the NG appliance
nameplate as close as possible to the current LP appliance
nameplate without covering it.
In the last page of the Use and Care Guide, write "Converted to
Natural Gas". Also record the conversion date and the
technician/company that performed the conversion.
Adjust High Flame Setting Screw
When converting from LP to Natural gas, you will need to
adjust the high flame setting screw for ideal burner flame
height.
1.
Remove each control knob for the main burners and sear
burner.
44
Closed valve
Open valve

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

720-0954r lp730-0954r730-0954r ng

Table des Matières