EdilKamin DAISY Installation, Usage Et Maintenance page 41

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 58
g. 1
E
M
g. 3
side
N
bottom
g. 4
M
Q
U
g. 6
INSTALLATION
X
g. 2
M
M
M
V
side
P
bottom
g. 5
L
g. 7
SMOKE OUTPUT
DAISY is designed for the connection of the smoke output pipe
at the back and left side.
The stove is delivered ready for the output of the ue from the
back (Fig. 1).
SMOKE OUTPUT CONNECTION ON THE LEFT SIDE
NOTE: CONNECT BEFORE ASSEMBLING THE COVE-
RING.
Fig. 2
• Open the pellet cover and loosen the screw (X) inside.
Fig. 3
• Remove the top (E) complete with the pellet loading cover
and the air grill.
• Slide off the two metal sides (M) by loosening the two milled
screws (V) on the rear of the stove.
• Remove the metal bracket (D) that fastens the lower horizon-
tal ceramic element (D - see page 45, Fig. 5).
Fig. 4-5
• Remove the elbow joint (N - provided) from smoke extractor
unit vent.
• Install the horizontal output pipe (P - optional) with the band
provided on the smoke extractor unit vent.
Fig. 6
• Replace the lower ceramic element and two metal sides (M),
remove the closing cover (Q) and use the rosette (U - optional).
Fig. 7
• Replace the top (L) complete with the pellet loading cover
and air grill and assemble the covering as shown in the fol-
lowing pages.
- 41
-

Publicité

Table des Matières
loading

Table des Matières