Installation Of The Sewage Treatment Technology; Assembly Of The Disc Diffusor In The Sbr Tank - Graf UPone 3 EW Notice De Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2. Installation of the sewage treatment technology

The tanks must be placed on a level and firm base.
When selecting the location for the treatment plant, note that the sewage treatment facility must be con-
nected to the roof ventilation, or that a separate ventilation pipe must be connected to the facility.
2.1

Assembly of the disc diffusor in the SBR tank

Hose to connect the disc diffusor,
pre-installed.
2. Installation of the sewage treatment technology
Cord to lower the disc diffusor into
the tank
Disc diffusor with weighted carrier
/

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Upone 6ew160470160471

Table des Matières