Étape / Step
VISSEZ LES BUTOIRS (6) AU JAMBAGES AVEC VIS 5/8"
11
FASTEN BUMPER (6) ONTO BOTH WALL JAMBS WITH 5/8" SCREW
INTÉRIEUR
DE LA DOUCHE
INTERIOR
SHOWER SIDE
- VISSEZ LES
Étape / Step
ET AU RAIL DU BAS AVEC VIS 5/8"
- POSEZ LES
12
- FASTEN SIDE GUIDES (2) ONTO WALL JAMBS
AND BOTTOM TRACK WITH 5/8" SCREW
- PUT SCREW CAP.
INTÉRIEUR
DE LA DOUCHE
INTERIOR
SHOWER SIDE
GUIDES LATÉREAUX
(2) AU JAMBAGES
CAPUCHON COUVRE-VIS.
Étape / Step
GUIDE D'INSTALLATION / INSTRUCTION MANUAL
Étape / Step
PLACEZ LE RAIL DU HAUT SUR LES JAMBAGES
13
PLACE TOP RAIL ON THE WALLJAMBS.
VUE LATÉRALE
SIDE VIEW
- VISSEZ LE RAIL DU HAUT AU JAMBAGES AVEC VIS 5/8"
- POSEZ LES CAPUCHONS COUVRE-VIS.
14
- FASTEN TOP TRACK ONTO WALL JAMBS WITH 5/8" SCREW.
- PUT SCREW CAP.
INTÉRIEUR
DE LA DOUCHE
INTERIOR
SHOWER SIDE
VUE LATÉRALE
SIDE VIEW
INTÉRIEUR
DE LA DOUCHE
INTERIOR
SHOWER SIDE
PAGE 6