Chapter 6. Machine adjustment and setting up
PHASE NR. 1 = SWITCHING THE MACHINE ON
Turn the main switch (Q1) into pos. 1.
The anomaly "- -" appears on display (D1) (figure because the machine is shipped with the sealing frame down. In oder to
bring the frame back to its start position and to remove the anomaly, press the emergency pushbutton (S0). Then turn it
to the right to release the emergency pushbutton.
The active programme no. appears on display (D1).
The tunnel units (heaters, fan, belt) are not activated in programmes P3, P4, P5 just after the selection of the
programmes listed above, but by means of a manual control. When selecting one of these programs, display will show
"L3" instead of "P3"; it is then necessary to press button (G2) to activate them.
PHASE NR. 2= CHECK DIRECTION OF ROTATION
Press the start button (S1).
Check the conveyor belt for correct rotation, which shall
match the direction that is shown in the figure.
Otherwise invert two of the three phases of the electrical
plug.
Note: The control of direction of rotation should be carried out each time you change the electrical plug.
PHASE NR. 3 = PROGRAMS SELECTION
Push button (P) to select the number of the program.
PHASE NR. 4 = VARIABLES PROGRAMMING
Through button (S) it is possible to look through the variables of the selected program, while through buttons (G1)-(G2)
the stored values can be modified. Once the value has been set, push button (S) button and then release it; the LED of
the next function will light up. Set the value of the variables as previously described.
To validate modifications, push button (S) until the number of the program appears on the display.
Pause time "lowered frame" can be modified; there is not a LED indicating this variable which is shown with an "r" on the
left display, while the right one shows the time which has been set. At the end of all variables to be adjusted, the display
will show the code of the program just chosen (for example P1).
Note: In case during programming the SQ1 limit switch is being pressed, the unit quits the scheduling, the selected
program is executed and the display shows the number of the program.
PHASE NR. 5 = PERFORMANCE
Before using the machine, wait until the adjusting temperature is reached. This is signalled by the warning light (F). Once
all adjustments have been made, the machine is ready to start working.
PHASE NR. 6 = POWER OFF
Exit from the tunnel unit before switching off the machine, if in programs P3, P4, P5.
Press button (G1) to do this. The display shows L3, L4, L5 (tunnel units deactivated).
The oven belt and fan continue working for about 15 minutes before switching off after heating
disconnection, in order to wait for the oven cooling.
Once off, the machine can be switched off by placing the mains switch (Q1) in position "0".