b) First starting:
Before the first use, remove the anti-corrosion protection fat with a cleaner and a wet
sponge.
During the first use, grease your plate with oil and preheat the crepe machine during
about 15 min. Once preheating is finished, set the power on the wished temperature.
First cleaning
Clean the device before the first use. (See 6 Cleaning)
Gas connection
The appliances run on the following gases: Butane G30, Propane G31, Natural gas
G20/G25. The appliances are originally delivered with a Butane/Propane injector cor-
responding to the category II2E+3+. The connection is made thanks to a thread 1/2.
The heat release rate of the appliance is 3.6 kW
For a use in natural gas, change the injector. It is delivered in a small plastic bag
placed in the package.
Connect the appliance to the gas supply pipe, interposing a stop valve which enables
the appliance to be insulated from the rest of the installation.
Check the supply pressure using a manometer when the burner is lit. It must be equal
to the indications on the rating plate.
The fresh air flow required for combustion air supply is:
CFG 400
7.2 m3/h
General conditions of installation
The installation and maintenance of the appliance must be carried out in compliance
with the statutory texts and good practices in force, mainly:
General specifications
For all appliances:
Article GZ Installation with combustible gases and liquefied hydrocarbons.
Then, according to use:
Article CH Heating, ventilation, refrigeration
Air conditioning and domestic hot water steam generation.
Article GC Installation of appliances to be used for catering
Specific provisions for each type of establishment to which the public is admitted
(hospitals, shops, etc )
Important: Never change the diameter of the injectors.
14