Start-Up
Acceptance test (in case of industrial/public use):
Before first use and after any significant modifications, the installation (including the electrical
connections) must be checked by an official expert.
A yearly check by a technical expert is required.
At least every four years, a quality inspection must be carried out by an official expert.
•
Install the DMX Power Pack on level, fire-proof ground that is not subject to impacts.
•
Secure the device with assembly fastenings that are compatible with the fastening surface and suitable for
carrying the weight of the device.
•
Use all fastening holes at the devices for installation and ensure that the assembly fastenings create a firm
connection to the fastening surface.
•
Secure the installation with an additional suitable safety restraint cable or a safety net. The safety restraint cable
or net must be able to support the device if the main support system fails.
22