During the first use, grease your plate with oil and preheat the crepe machine during
about 15 min. Once preheating is finished, set the power on the wished temperature
thanks to the power control knob (n°3 on picture)
First cleaning
Clean the device before the first use. (See 6 Cleaning)
Gas connection
The appliances run on the following gases: Butane G30, Propane G31, Natural gas
G20/G25. The appliances are originally delivered with a Butane/Propane injector corre-
sponding to the category II2E+3+. The connection is made thanks to a thread 3/8.
The heat release rate of the appliance is
CSG 350 / CSG 400 3.2 Kw
CDG 350 / CDG 400 6.4 Kw
For a use in natural gas, change the injectors. They are delivered in a small plastic bag
placed in the package.
Connect the appliance to the gas supply pipe, interposing a stop valve which enables
the appliance to be insulated from the rest of the installation.
Check the supply pressure using a manometer when the burner is lit. It must be equal
to the indications on the rating plate.
The fresh air flow required for combustion air supply is:
- CSG 350 / CSG 400
7.2 m3/h
- CDG 350 / CDG 400
14.4 m3/h
General conditions of installation
The installation and maintenance of the appliance must be carried out in compliance
with the statutory texts and good practices in force, mainly:
General specifications
For all appliances:
Article GZ Installation with combustible gases and liquefied hydrocarbons.
Then, according to use:
Article CH Heating, ventilation, refrigeration
Air conditioning and domestic hot water steam generation.
Article GC Installation of appliances to be used for catering
Specific provisions for each type of establishment to which the public is admitted
(hospitals, shops, etc )
15