Mechanical Installation; Important Precautions During Installation; General Installation Guidelines - HBM S9M Notice De Montage

Masquer les pouces Voir aussi pour S9M:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

12
5

Mechanical installation

5.1 Important precautions during installation

• Handle the transducer with care.
• Welding currents must not be allowed to flow over the transducer. If there is
a risk that this might happen, you must use a suitable low‐ohm connection
to electrically bypass the transducer. HBM, for example, provides the highly
flexible EEK ground cable, which can be screwed on, both above and
below the transducer.
• Make sure that the transducer cannot be overloaded.
WARNING
There is a danger of the transducer breaking if it is overloaded. This can
cause danger for the operating personnel of the system in which the
transducer is installed.
Implement appropriate safety measures to avoid overloads or to protect
against resulting dangers.

5.2 General installation guidelines

The forces to be measured must act on the transducer as accurately as pos­
sible in the direction of measurement. Torsional and bending moments, ec­
centric loading and lateral forces may produce measurement errors and de­
stroy the transducer, if limit values are exceeded.
Important
The cable fastening side of the transducer should always be connected dir­
ectly with the rigid customer-side force transfer areas. Ensure that the cable
is laid so that, where possible, no force shunt is caused by the cable (e.g.
through the weight or stiffness of the cable).
HBM
S9M
A3019-5.0 en/de/fr

Publicité

Table des Matières
loading

Table des Matières