5
Commissioning
Before switching on
5
Commissioning
Before switching on
(
Stop!
Please check the entire wiring with regard to completeness, short circuit and
earth fault, before you switch on the basic device with function module for the
first time in the AS−i network.
Status display
LED status
Green LED
Red LED
OFF
OFF
ON
OFF
ON
ON
BLINKING
ON
)
Note!
Please note the position markings on the fold−out page.
ƒ
The function module is supplied via the AS−i bus.
ƒ
30
Description
No supply voltage
Bus supply and communication are ok.
l
Communication is interrupted.
l
Parameter writing not possible.
l
"IC watchdog" has been reset.
Communication not possible because no valid bus node address has
been assigned (address = 0).
l
EDK82ZAFFC−001 DE/EN/FR 7.0