ENGLISH
MAINTENANCE
The lifespan of the machine and its maximum operating safety are ensured by correct and regular maintenance.
The following chart provides the scheduled maintenance. The intervals shown may vary according to particular working conditions,
which are to be defined by the person in charge of the maintenance.
WARNING!
Maintenance procedures must be performed with the machine switched off and the power supply cable
disconnected from the electrical mains.
Moreover, carefully read the instructions in the Safety chapter.
All scheduled or extraordinary maintenance procedures must be performed by qualified personnel, or by an authorised Service
Center.
This Manual describes only the easier and most common maintenance procedures.
NOTE
For other maintenance procedures shown in the Scheduled Maintenance Table, refer to the Service Manual that can be
consulted at any Service Center.
SCHEDULED MAINTENANCE TABLE
Procedure
Squeegee cleaning
Brush cleaning
Tank and vacuum grid cleaning
Squeegee blade check and replacement
Solution filter cleaning
Screw and nut tightening check
Vacuum system motor carbon brush check and replacement
(1)
And after the first 8 working hours.
(2)
This maintenance procedure must be performed by KENT authorised Service Center.
INTEGRITY CHECK OF POWER SUPPLY CABLE AND EXTENSION
Carefully check if the power supply cable, the extension and the plugs are worn or damaged.
If necessary, have them replaced by the Service Center.
14
INSTRUCTIONS FOR USE
909 6311 000(3)2009-11
Daily, after using
Weekly
the machine
Razor E17
Every six
Yearly
months
(1)
(2)