Set Panel; Previous Inspections - Key Automation TURBO 40 Manuel D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 22
4
6
10
8
5
Before the installation starts, we suggest to carry out following inspections and operations:
1_ The gate framework must be strong and suitable.
2_ The gate must not show too many sideways slide skids during the running.
3_ The system of wheels/lower rail and roller/upper runner must work without too many frictions.
4_ To avoid the gate derailment you must install the stop beats of the sliding, whether at the opening or
closing, and a second upper roller/runner in full observance of the current law.
5_ Remove any manual lock in the beforehand gates.
6_ Take on the gate bottom the feed raceway of the feeding cables (Ø25-50mm) and of external connec-
tion (photocell, flash-light, key selector, etc...).

SET PANEL

5
7

PREVIOUS INSPECTIONS

14
1
2
3
4
5
6
7
8
9
10
9
5
1
8
Gear-motor
Flash-light
Antenna.
Key selector
Photocell
Small columm
Rack
Limit switch
Warning sign
Stop locks
3
2
6
10

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Turbo 80Turbo 120Turbo 160

Table des Matières